
For Summer 2024, we will install a new set of swings and add some temporary equipment to the space – a climbing structure with a slide, a playhouse, and a frame for a sandbox. All these pieces, with the exception of the swings, can be removed at the close of this season. The Board will continue to develop a fully redesigned playground plan that can be integrated with the inground work needed and potentially have pieces that we can remove every winter. The new playground design, still under construction, will be installed for the 2025 summer.